Complete reconstruction of the state road N08 Interlaken-Ost-Brienz, Switzerland

Investor Bundesamt für Strassen ASTRA, Filiale Thun, CH-6300 Thun Higher supplier ARGE Marti Brienzersee Construction period January 2021 – December 2023 Description of main objects: Complete reconstruction of the state N08 between Interlaken Ost and Brienz. Section length: 13,83 km maintenance section no. 60 Number of bridges and other civil engineering structures: 38 Number of…

Záhorská Bystrica – reservoir, supply and stock pipes

Investor Bratislavská vodárenská spoločnosť a. s. Construction period March 2021 – November 2022 Description of the objects: The construction consists of a line part, a supply pipe DN200 to the reservoir and supply piping DN150 and DN300, NN connection and reservoir. The reservoir is divided into a handling (dry) and wet chamber. The wet chamber consists…

ŽSR, Completion of the Žilina -Teplička railway shunting station

Investor Railways of the Slovak Republic General contractor EUROVIA CS, a.s. – organizational unit Slovakia Construction period March 2021 – December 2023 Description of the objects: SO 53-37-01 Žilina Strážov – Váh, rain sewerage SO 53-37-02 Žilina Strážov – Váh, relocation of water mains SO 53-37-03 Žilina Strážov – Váh, relocation of sewerage Construction technology: SO…

Veľké Leváre – Sanation of the public water main

Client Bratislavská vodárenská spoločnosť, a.s. Construction period January 2021 – August 2023 Technology of the construction: Reconstruction of the existing pipeline in the part of the municipality due to the emergency condition, bad technical conditions, but mainly due to increased incrustations in the pipeline which reduce water flow and need to be replaced with new ones…

Increasing the security of the area against the backwater of the Little Danube and the Klátovský arm from river Váh, 1st stage

General contractor JV TuCon – VÁHOSTAV SK, Klátovské rameno, Leader of JV – TuCon Construction period October 2019 – April 2022 Technology of the construction: The structure is a flood protection work, which dams the flow of the Klátovský arm and deflects it to the new built river basin. The dam consists of reinforced concrete „Closing…