Complete reconstruction of the state road N08 Interlaken-Ost-Brienz, Switzerland

Investor Bundesamt für Strassen ASTRA, Filiale Thun, CH-6300 Thun Higher supplier ARGE Marti Brienzersee Construction period January 2021 – December 2022 Description of main objects: Complete reconstruction of the state N08 between Interlaken Ost and Brienz. Section length: 13,83 km maintenance section no. 60 Number of bridges and other civil engineering structures: 38 Number of…

Extension of the sewerage, relocation of the water main, Budatín – Horná street

Client Severoslovenské vodárne a kanalizácie, a.s. Construction period July 2020 – November 2020 Description of the objects: BO 01 Extension of the sewerage Branch B: sewerage system –  PVC SN8 DN300 in the total length of 295,7 m Branch C: sewerage system –  PVC SN8 DN300 in the total length of 129,1 m BO 02 Relocation…

Motorway D1 Prešov West – Prešov South, Fire-protection water main in Tunnel

Client National Motorway Company a.s. General contractor Doprastav a.s. Construction period July 2020 – September 2021 Description of the objects:  Ensuring a sufficient capacity of fire-protection water in case of a fire in the tunnel Technology of construction: Water supply is designed from spigot pipes and ductile iron pipes DN 150 PN 16, system BLUTOP by…

Increasing the security of the area against the backwater of the Little Danube and the Klátovský arm from river Váh, 1st stage

General contractor JV TuCon – VÁHOSTAV SK, Klátovské rameno, Leader of JV – TuCon Construction period October 2019 – April 2022 Technology of the construction: The structure is a flood protection work, which dams the flow of the Klátovský arm and deflects it to the new built river basin. The dam consists of reinforced concrete „Closing…

Žilina – Brodno – Extension of the water main

Client Severoslovenské vodárne a kanalizácie, a.s. Žilina Construction period March 2019 – June 2020 Technology of the construction: Extension of the water main in Žilina municipality, Brodno district. Water supply will be connected to the existed water supply in location managed by SeVaK, a.s.. Damaged parts of the existed local water supply will be removed. Executed…

Design and construction of D4 highway and R7 expressway

Promotional video Client Ministerstvo dopravy a výstavby Slovenskej Republiky General contractor D4R7 Construction s.r.o. Construction period February 2019 – May 2020 Description of the objects: BO520/SO521 – parallel water pipeline made of ductile cast iron DN1400, PN16 in the length of 816m, with 3 revision and 2 shutter shafts; pipeline is installed in protective reinforced concrete pipe…

Force main of pressure sewage system Presskan in WWTP Piešťany

Client Interest grouping of corporate entities PRESSKAN, 916 22 Podolie 566 General contractor TuCon, a.s. Construction period August 2018 – October 2018 Description of objects: Modification of existing pipeline of pressure sewage system Presskan in WWTP Piešťany for the purpose of reliable operation of newly built sewage system in municipalities Podolie and Očkov Building method: Reconstruction…

Modernisation of D1 – section 12, Exit 90 Humpolec – Exit 104 Větrný Jeníkov

Client TGS Joint Venture, Prague General contractor TuCon, a.s. Construction period July 2018 – December 2018 Technology of construction: Demolition of the original rain water sewer of motorway and building of the new rain water dewatering including shafts, connections, mountain inlets, waterproofing tests and camera inspection. Reconstruction of the rain water sewer in the middle of…

Technical infrastructure of the industrial park in Čadca

Client Municipality of Čadca General contractor Severoslovenské vodárne a kanalizácie, a.s. Construction period September 2018 – April 2019 Description of the objects: BO 01 Extension of the public water main BO 02 Extension of the public sewerage system Technology of construction: Pipelines will be placed parallely in a open trench with vertical walls Executed works: BO…

Production and logistic park Seoyon E-HWA Automotive Slovakia in Čadca

Client Seoyon E-HWA Automotive Slovakia s.r.o. Client Hochtief CZ, a.s., organizačná zložka Slovensko Construction period March 2018 – July 2018 Description of the objects: preparing of the area – earth works Executed works: relocation of the topsoil excavation of the drainage trench exchange of the background layer lime stabilisation of the soil layers – earth…