Object: SO 01 Reconstruction of long-distance water pipeline km 0.000 00 – 1.359 34 Client: Západoslovenská vodárenská spoločnosť, a.s. Construction period: May 2024 – September 2024 Description of objects: The DN 600 water pipeline in the section Kolta – Svodín is part of the pipeline that supplies the city of Štúrovo and the adjacent villages…
Client: Severoslovenské vodárne a kanalizácie, a. s., Žilina Construction period: November 2023 – August 2024 Construction technology: excavation work – trench excavation, trench lining, pipe bed, laying PVC pipe DN 300 (sewage) and HDPE pipe DN 150 (water supply), pipe backfilling, trench backfilling with gradual compaction, final treatment of communications. Description of objects: sewer “K”…
Investor Lipovec municipality Contractor: JV TUCON-Combin_Lipovec Construction period: October 2023 – October 2024 Description of objects: Construction of part of the sewage network and sewage connections in the village of Lipovec, specifically on the following SO or PS: Sewer network Lipovec SO 19 – Lipovec sewage network SO 19/A – Lipovec sewage network -…
Investor Bratislavská vodárenská spoločnosť, a.s. Obdobie výstavby august 2023 – december 2024 Technológia výstavby: Predmetom plnenia je sanácia existujúceho vodovodu a existujúcej verejnej kanalizácie na Vajnorskej ulici v Bratislave, v úseku medzi Trnavským mýtom a križovatkou ulíc Kutuzovova a Vajnorská. Nové potrubia verejného vodovodu a verejnej kanalizácie budú vedené v jednej spoločnej ryhe. Komunikácie a…
Investor Municipality of Pribeta Construction period June 2023 – August 2024 Description of objects: The subject of the filling is the gravity sewer PVC DN 250 and DN300 of 20 716m length, the HDPE sewage printout DN 65 and DN 80 of 2 043m length, including 8x CHS and 1 218x (9 402m) PVC sewer…
Investor Bratislavská vodárenská spoločnosť, a. s. Construction period July 2023 – April 2024 Description of objects: The subject of the contract is the rehabilitation of the storage chamber at the Reservoir Vtáčnik 1×7300 m3 in Bratislava. The subject of the implementation will be the rehabilitation of walls, ceiling beams, rehabilitation of defects in the structure,…
Investor The village of Čakany Construction period June 2023 – December 2023 Description of objects: The subject of the order is construction work – sewerage of the village of Čakany, based on the project documentation. The construction of the work (stage 5) consists of a sewage network in the territory of the intra-village of the…