VDJ Vtáčnik, rehabilitation of the storage chamber

Investor Bratislavská vodárenská spoločnosť, a. s. Construction period July 2023 – April 2024 Description of objects: The subject of the contract is the rehabilitation of the storage chamber at the Reservoir Vtáčnik 1×7300 m3 in Bratislava. The subject of the implementation will be the rehabilitation of walls, ceiling beams, rehabilitation of defects in the structure,…

Sewerage od the group of municipalities of Horný Žitný ostrov stage 5 – Sewerage of Čakany

Investor The village of Čakany Construction period June 2023 – December 2023 Description of objects: The subject of the order is construction work – sewerage of the village of Čakany, based on the project documentation. The construction of the work (stage 5) consists of a sewage network in the territory of the intra-village of the…

Záhorská Bystrica, Renovation of the water supply on Donská street and Reduction shaft, connection near D2

Client Bratislavská vodárenská spoločnost, a.s. Construction period October 2022 – May 2023 Construction technology: The subject of the performance is the implementation of construction works for the rehabilitation of the existing DN200 pipeline for a new pipe made of ductile iron TVLT (PN10) – DN300 with a length of approx. 795 m. The entire rehabilitation…

Bratislava, Hradská street – Reconstruction of the water supply

Client Bratislavská vodárenská spoločnost, a.s. Construction period May 2022 – September 2022 Description of objects: The subject of the performance is the realization of the public water supply pipe on Hradská street, that includes to provide the necessary permits and engineering activity necessary for the realization of the construction. The existing water supply pipe will…

WWTP Kolárovo – reconstruction and extension 1st stage

https://www.tucon.sk/wp-content/uploads/Tucon-Kola-rovo-FHD.mp4 Client: Západoslovenská vodárenská spoločnosť, a.s. Construction period: March 2022 – October 2023 Construction technology: The subject of the project is the reconstruction and extension of the existing Kolárovo WWTP to a total capacity of 13,750 PE. The construction of the WWTP will take place during full operation of the original pumping station resp. without…

Complete reconstruction of the state road N08 Interlaken-Ost-Brienz, Switzerland

Investor Bundesamt für Strassen ASTRA, Filiale Thun, CH-6300 Thun Higher supplier ARGE Marti Brienzersee Construction period January 2021 – December 2022 Description of main objects: Complete reconstruction of the state N08 between Interlaken Ost and Brienz. Section length: 13,83 km maintenance section no. 60 Number of bridges and other civil engineering structures: 38 Number of…

Záhorská Bystrica – reservoir, supply and stock pipes

Investor Bratislavská vodárenská spoločnosť a. s. Construction period March 2021 – November 2022 Description of the objects: The construction consists of a line part, a supply pipe DN200 to the reservoir and supply piping DN150 and DN300, NN connection and reservoir. The reservoir is divided into a handling (dry) and wet chamber. The wet chamber consists…

Veľké Leváre – Sanation of the public water main

Client Bratislavská vodárenská spoločnosť, a.s. Construction period January 2021 – August 2023 Technology of the construction: Reconstruction of the existing pipeline in the part of the municipality due to the emergency condition, bad technical conditions, but mainly due to increased incrustations in the pipeline which reduce water flow and need to be replaced with new ones…

Extension of the sewerage, relocation of the water main, Budatín – Horná street

Client Severoslovenské vodárne a kanalizácie, a.s. Construction period July 2020 – November 2020 Description of the objects: BO 01 Extension of the sewerage Branch B: sewerage system –  PVC SN8 DN300 in the total length of 295,7 m Branch C: sewerage system –  PVC SN8 DN300 in the total length of 129,1 m BO 02 Relocation…

Motorway D1 Prešov West – Prešov South, Fire-protection water main in Tunnel

Client National Motorway Company a.s. General contractor Doprastav a.s. Construction period July 2020 – September 2021 Description of the objects:  Ensuring a sufficient capacity of fire-protection water in case of a fire in the tunnel Technology of construction: Water supply is designed from spigot pipes and ductile iron pipes DN 150 PN 16, system BLUTOP by…