ŽSR, Completion of the Žilina – Teplička railway shunting station and the related railway infrastructure at the Žilina junction

Investor

Railways of the Slovak Republic

General contractor

EUROVIA CS, a.s. – organizational unit Slovakia

Construction period

March 2021 – December 2024

Description of the objects:

  • BO 53-37-01 Žilina Strážov – Váh, rain sewerage
  • BO 53-37-02 Žilina Strážov – Váh, relocation of water mains
  • BO 53-37-03 Žilina Strážov – Váh, relocation of sewerage

Construction technology:

BO 53-37-01 Žilina Strážov – Váh, rain sewerage

  • construction of rainwater sewerage from PVC pipes DN 300 for drainage of rainwater from the railway body in the total length of 3007 m
  • realization of oil separators in the number of 17 pieces
  • production of infiltration objects in the number of 16 pieces
  • realization of an outlet object

BO 53-37-02 Žilina Strážov – Váh, relocation of water mains

  • relocation of water main pipes HDPE DN 100 in the total length of 282 m
  • relocation of water main ductile iron pipes DN 100 in the total length of 104 m
  • relocation of water main ductile iron pipes for ductile iron DN 300 in a total length of 298 m
  • relocation of water mains from HDPE D 50 pipes in the area of ŽST Žilina in the total length of 798,6 m
  • protection of water mains by making a reinforced geodesk from the gravel

BO 53-37-03 Žilina Strážov – Váh, relocation of sewerage

  • relocation of sewerage from OLS (fiberglass laminate) pipes DN 600 in the total length of 116,7 m
  • relocation of sewerage from OLS (fiberglass laminate) pipes DN 700 in a total length of 80,8 m
  • protection of the sewer collector by making a reinforced geodesk from the gravel