Motorway D3 Žilina (Brodno) Kysucké Nové Mesto – feeder

Client

National Motorway Company a.s.

General contractor

Metrostav DS a.s.

Construction period

February 2022 – May 2023

Destription of the objects:

  • Object 543 Modification of water supply DN 800 at km 15,830 – 16,700 D3
  • Object 543 Cathodic protection of water supply relocation DN 800 at km 15,830 – 16,700 D3

Technology of construction:
Relocation of the existing water supply feeder DN800 of the grouped water supply Nová Bystrica – Čadca – Žilina OC PN25
Pipe diameter: DN 800
Pipe length: 886.85 m
Pipe material: ductile iron PN 25