Client
VSK MINING s.r.o.
Superior Contractor
TuCon a.s.
Construction period
July 2010 – August 2010
Structures description:
- Footway – stepladders and platforms assembly
Construction technology:
- Footway assembly in the ventilation shaft 320 m of length in direction from the top to the bottom of shaft by using of Alimag driving platform
Executed Works:
- Footway assembly and Alimag platform´s guide way disassembly