Road tunnel Rosenstein, Germany

Client

Landeshauptstadt Stuttgard, Tiefbauamt, Hohe Strasse 25, 70176 Stuttgart, Germany

General contractor

ARGE Marti Tunnel Rosenstein

Construction period

April 2014 – August 2018

Objects descriptions / Description of the objects:

  1. Access tunnel, lenght 72m
  2. Road tunnel consisting of two paralel tunnel tubes, each with a lenght of 750m

Construction technology:

  • Tunnel driving by mining methods without drill&blast works .

Executed works:
1. Preparing of site area
2. Excavation of access tunnel from bus parking place – ZOO Wilhelma
3. Excavation of main tunnels:
– downwards excavation: south tunnel tube, direction Neckartalstrasse (breakthrough No.4)
– downwards excavation: north tunnel tube, direction Neckartalstrasse (breakthrough No.4)
– upwards excavation: south tunnel tube, direction Pragstrasse (breakthrough No.4)
– upwards excavation: north tunnel tube, direction Pragstrasse (breakthrough No.4)