General contractor
Marti Tunnel AG, Switzerland
Construction period
April 2019 – November 2021
Technology of the construction:
The tunnel (for the future water main ) will be driven by NTM – Norway Tunneling.
Executed Works:
TuCon is participating in driving of access tunnel and main tunnel in the total lenght of 3 300 m, cross section 30 m2.