D3 Svrčinovec – Skalité

Investor

National Motorway company, a.s.

General contractor

Doprastav, a.s.

Construction period

May 2014 – October 2016

Construction technology:
SO 807-22 Retaining wall on the right side of the cart road to km 23,500 D3

  • preparation of the base, drainage system
  • assembly of the Maccaferri Gabions system
  • filling of the gabion´s wire mesh baskets with rock fr. 36/63 mm a 100/200 mm

SO 058-02 Landscaping of the Čierny potok area

  • embankment of dumping place, compaction
  • assembly of the Green Terramesh system used for soil reinforcement of the embankment (Maccaferri formwork system)