Client
Skačany municipality
Contractor
TuCon, a.s. Žilina
Construction period
September 2011 – April 2012
Objects description:
- SO 01 – Footpaths reconstruction
- SO 02 – Footpaths construction
- SO 03 – Construction of scattering areas
- SO 04 – Local roads reconstruction
- SO 05 – Installation of small architecture elements
- SO 06 – Landscaping treatment
- SO 07 – Wiring extension for street lighting
Construction technology:
SO 01 – Footpaths reconstruction
SO 02 – Footpaths construction
SO 03 – Construction of public areas
- Removal of existing asphalt and concrete areas, footpaths demolition
- Removal of vegetation cover and organic soil from ground surface
- Excavation and transport of excavated material
- Placing of base layers, laying of kerbstones, structural pavement and concrete slot gutters
SO 04 – Local roads reconstruction
- Complete reconstruction of the asphalt surfaces in local roads – excavation works up to the road level, laying of kerbstones, construction of pavement layers as described, installation of traffic signs
- Partial reconstruction of the asphalt surfaces in local roads – road holes repairing
SO 05 – Installation of small architecture elements
- Removal of the original furnishing elements
- Installation of new small architecture elements (park benches, trash cans, information boards and public notices, wooden shelter)
SO 06 – Landscaping treatment
- Removal of plants and trees, soil preparation, planting trees and bushes, mulching, grass planting
SO 07 – Wiring extension for street lighting
- Laying of cable routes
- Installation of public lighting