Závod – sewerage, II.stage

Client

Závod municipality

Main Contractor

BCI, a.s., Žilina, Subcontactor: TuCon, a.s. part ca 30%
Other Subcontractors: Unistav spol. s r.o. Senica and OHL PS a.s., Bratislava

Construction period

November 2012 – June 2012

Description of Structures:

  • SO 01  Pipeline mains DN 300, main sewer B : length 962m, locality IBV : length 570 m, total length of 1532 m
  • SO 02 House connections DN 150, main  sewer B : length 600 m, locality IBV : length 231 m, total length 831 m

Construction technology:
Excavation, trenches sheeting, complete gravel backfill, concreting of the road th. 200 mm as a base of asphalt cover.