Reclamation & Closure Landfill, MYSLINA

Client

Humenné Town

Contractor

TuCon, a.s. Žilina

Construction period

July 2011 – March 2012

Structures description:

  • SO 01 GROSS LANDSCAPING
  • SO 02 RECLAMATION LANDFILL
  • SO 03 GAS BOREHOLES

Construction technology:

SO 01 GROSS LANDSCAPING

  • Landscaping and sloping of landfill by excavations and embankments to the required shape
  • Embankment compacting in layers
  • Excavation of drainage in open-cut area, 450 m length
  • Slope stabilizing by excavation of pit in 2.00 m of depth, 2.50 m of width and 145 m of length and bottom backfilling by gross gravel

SO 02 RECLAMATION LANDFILL

  • Laying of surface gas drainage of gravel fr.16-32 mm, the layer thickness of 300 mm
  • Constructing of the protective layer of geotextile
  • Performing a mineral sealing layer, two layers of clay up to 250 mm
  • Laying of HDPE foil sealing layer in thickness of 1.50 mm
  • Constructing of the protective layer of geotextile
  • Performing of retention drainage layer of gravel fr. 16-32, the layer thickness of 500 mm
  • Constructing of a separation and filter layer of geotextile
  • Constructing of the top cover reclamation layer of a soil in thickness of 1000 mm
  • Sowing grass seed on the surface of the reclaimed landfill

SO 03 GAS BOREHOLES

  • Gas boreholes drilling (3 pc) of steel casing in dia. of 136 mm, inner perforated casing in dia. of 110 mm
  • Filling a free space between the borehole and perforated casing by gravel sand in dia. of 8-16 mm
  • Clay sealing of gas boreholes