Šúrsky kanál (canal), rybničná street, water delivery

Client

Municipality of Chorvátsky Grob

Construction period

December 2008 – September 2010

Construction technology:
Realisation of water pipeline in open cut area

Executed works:

  • installation of water pipeline TVLT DN 400 of 2082 m length in open cut area
  • 2x overpressure under the local road DN 600
  • cross-over of the local river by the bridge
  • execution of 2 monolithic shafts and their equipping in places of connection to existing branch of water distribution DN 400, TVLT