ŽSR, Žilina, teplička Station, 2nd Project, 2nd phase

Client

ŽSR GR Bratislava (Railways of the Slovak Republic, Board of management Bratislava)

Superior Contractor

TEPLIČKA association – chief member of the EUROVIA CS, a. s. association

Construction Period

August 2009 – November 2011

Structures description:

  • SO 2920 By-pass sewage system (BPSS)
  • SO 2920.2 Water – pumping station BPSS – construction part
  • SO 2920.1 Water – pumping station BPSS – M&E part
  • SO 2920.5 Water – pumping station BPSS – Reserve power supply – M&E part
  • SO 2918 Sewage system – 2nd part
  • SO 2904 Water supply – distribution net
  • SO 2903.1 Water supply – supply pipeline MOBIS- Water source Gbelany
  • SO 2903.2 Water supply – supply pipeline Gbelany – Station

Construction technology:

  • trenches excavation, trenches sheeting, sand cradle execution
  • laying of PE sewage pipes DN 800, DN 300 by welding
  • laying of PE water pipe line DN160 including fittings, valves, hydrants
  • assembling of PE sewage shafts DN1000
  • RC gauging shaft execution
  • construction of high-capacity pumping station including M&E part and ASRTP
  • small waste water treatment plant construction for operation objects of Teplicka station